Embedded Systems Engineering Lead - ESS

Denver, CO or SF Bay Area, CA / On-site / Full-Time / ESS Engineering

Apply Now

About the Company:

Peak Energy is the first American venture to advance globally proven Sodium-Ion battery systems as the storage standard for the new era of renewable energy on a resilient grid. Sodium-Ion is cheap, readily available and safe, making it the leading contender in a rapidly evolving market.

Our leadership team is powered by decades of expertise in scaling gigawatt-level innovation at world-class companies such as Tesla, Northvolt, SunPower, Fluence, and Enovix. We are backed by strategic investment and product partners such as TDK Ventures and Eclipse Ventures.

We are a team of engineers, operators, entrepreneurs, and partners driven by a shared ambition to set the new performance standard for renewable energy and grid resilience.

About the Job:

Peak Energy is looking for an Embedded Systems Engineering Lead – Energy Storage Systems (ESS) to lead the development of our gigawatt scale battery electrical and controls systems. This role will own the design direction, implementation and testing of Peak’s embedded systems design and will work with the other design and manufacturing teams along with external partners to provide design direction and engineering implementation leadership. This person is both a leader and a doer.

Responsibilities:

Minimum Qualifications:

Preferred Qualifications:

We do not accept applicants from third-party recruiters or agencies.

Peak Energy is an equal opportunity employer.